IMPLEMENTATION OF DISTRIBUTION AUTOMATION

The implementation of “distribution automation” within the continental U.S. is as diverse and numerous as the utilities themselves. Particular strategies of implementation utilized by various utilities have depended heavily on environmental variables such as size of the utility, urbanization, and available communication paths. The current level of interest in distribution automation is the result of:

• The maturation of technologies within the past 10 years in the areas of communication and RTUs/ PLCs.
• Increased performance in host servers for the same or lower cost; lower cost of memory.
• The threat of deregulation and competition as a catalyst to automate.
• Strategic benefits to be derived (e.g., potential of reduced labor costs, better planning from better information, optimizing of capital expenditures, reduced outage time, increased customer satisfaction).

While not meant to be all-inclusive, this section on distribution automation attempts to provide some dimension to the various alternatives available to the utility engineer. The focus will be on providing insight on the elements of automation that should be included in a scalable and extensible system. The approach will be to describe the elements of a “typical” distribution automation system in a simple manner, offering practical observations as required.

For the electric utility, justification for automating the distribution system, while being highly desirable, was not readily attainable based on a cost/benefit ratio due to the size of the distribution infrastructure and cost of communication circuits. Still there have been tactical applications deployed on parts of distribution systems that were enough to keep the dream alive. The development of the PC (based on the Intel architecture) and VME systems (based on the Motorola architecture) provided the first low cost SCADA master systems that were sized appropriately for the small co-ops and municipality utilities.

New SCADA vendors then entered the market targeting solutions for small to medium-sized utilities. Eventually the SCADA vendors who had been providing transmission SCADA took notice of the distribution market. These vendors provided host architectures based on VAX/VMS (and later Alpha/Open- VMS) platforms and on UNIX platforms from IBM and Hewlett-Packard. These systems were required for the large distribution utility (100,000–250,000 point ranges). These systems often resided on company owned LANs with communication front-end processors and user interface attached either locally on the same LAN or across a WAN.

Comments

Popular posts from this blog

PRIMARY SECONDARY AND TERTIARY FREQUENCY CONTROL IN POWER SYSTEMS

Primary, Secondary and Tertiary Frequency Control in Power Systems Author: Engr. Aneel Kumar Keywords: frequency control, primary frequency control, automatic generation control (AGC), tertiary control, load-frequency control, grid stability. Frequency control keeps the power grid stable by balancing generation and load. When generation and demand drift apart, system frequency moves away from its nominal value (50 or 60 Hz). Grids rely on three hierarchical control layers — Primary , Secondary (AGC), and Tertiary — to arrest frequency deviation, restore the set-point and optimize generation dispatch. Related: Power System Stability — causes & mitigation Overview of primary, secondary and tertiary frequency control in power systems. ⚡ Primary Frequency Control (Droop Control) Primary control is a fast, local response implemented by generator governors (dro...

Advantages of Per Unit System in Power System Analysis | Electrical Engineering

  Advantages of Per Unit System in Power System Analysis In electrical power engineering, the per unit (p.u.) system is one of the most widely used techniques for analyzing and modeling power systems. It is a method of expressing electrical quantities — such as voltage, current, power, and impedance — as fractions of chosen base values rather than their actual numerical magnitudes. This normalization technique provides a universal language for system calculations, minimizing errors, simplifying transformer modeling, and enabling consistency across multiple voltage levels. Because of these benefits, the per unit system is essential in fault analysis, load flow studies, transformer testing, and short-circuit calculations . ⚡ What is the Per Unit System? The per unit system is defined as: Q u a n t i t y ( p u ) = A c t u a l   V a l u e B a s e   V a l u e Quantity_{(pu)} = \dfrac{Actual \ Value}{Base \ Value} Q u an t i t y ( p u ) ​ = B a se   ...

PHASOR DIAGRAM OF A TWO AXIS SALIENT POLE GENERATOR

Following phasor is phsor diagram of a two-axis salient pole generator . The following points apply to the drawing of phasor diagrams of generators and motors:- • The terminal voltage V is the reference phasor and is drawn horizontally. • The emf E lies along the pole axis of the rotor. • The current in the stator can be resolved into two components, its direct component along the ‘direct or d-axis’ and its quadrature component along the ‘quadrature or q-axis’. The emf E leads the voltage V in an anti-clockwise direction when the machine is a generator. Each reactance and resistance in the machine has a volt drop associated with it due to the stator current flowing through it. Consider a generator. The following currents and voltages can be shown in a phasor diagram for both the steady and the dynamic states. E                      the emf produced by the field current If . V    ...

DISTRIBUTION STATCOM D-STATCOM

The D-STATCOM is basically one of the custom power devices. It is nothing but a STATCOM but used at the Distribution level. The D-STATCOM is a voltage or current source inverter based custom power device connected in shunt with the power system. It is connected near the load at the distribution systems. The key component of the D-STATCOM is a power VSC that is based on high power electronics technologies. Basically, the D-STATCOM system is comprised of three main parts: a VSC, a set of coupling reactors and a controller. The basic principle of a D-STATCOM installed in a power system is the generation of a controllable ac voltage source by a voltage source converter (VSC) connected to a dc capacitor (energy storage device). The ac voltage source, in general, appears behind a transformer leakage reactance. The active and reactive power transfer between the power system and the D-STATCOM is caused by the voltage difference across this reactance. The D-STATCOM is connected in shunt w...

ADVANTAGES AND DISADVANTAGES OF CORONA EFFECT IN TRANSMISSION LINES | ELECTRICAL ENGINEERING GUIDE

Advantages and Disadvantages of Corona Effect in Power Systems In high-voltage overhead transmission lines , the corona effect plays a critical role in system performance. Corona occurs when the air around a conductor becomes ionized due to high electric stress. While often seen as a drawback because of power losses and interference , it also provides certain engineering benefits . This article explains the advantages and disadvantages of corona effect in detail, with examples relevant to modern electrical power systems. ✅ Advantages of Corona Effect Increase in Virtual Conductor Diameter Due to corona formation, the surrounding air becomes partially conductive, increasing the virtual diameter of the conductor. This reduces electrostatic stress between conductors and minimizes insulation breakdown risks. Related Reading: Electrostatic Fields in High Voltage Engineering Reduction of Transient Surges Corona acts like a natural cushion for sudden ...

DC GENERATORS

Principle: An electrical generator is a machine which converts mechanical energy into electrical energy. The energy conversion is based on the principle of the production of dynamically induced emf, where a conductor cuts magnetic flux, dynamically induced emf is produced in it according to Faraday’s Laws of electromagnetic Induction. This emf causes a current to flow if the conductor circuit is closed. Hence, two basic essential parts of an electrical generator are (i) a magnetic field and (ii) a conductor or conductors which can so move as to cut the flux. The following figure shows a single-turn rectangular copper coil rotating about its own axis in a magnetic field provided by either permanent magnets or electromagnets. The two ends of the coil are joined to two slip-rings ‘a’ and ‘b’ which are insulated from each other and from the central shaft. Two collecting brushes (of carbon or copper) press against the slip-rings. Their function is to collect the current induced in the coi...

Operation of Thyristor Controlled Series Capacitor (TCSC): Mechanism and Working Principles

Introduction In modern power systems, maintaining voltage stability and optimizing power transmission is crucial. One of the most effective FACTS (Flexible AC Transmission System) controllers for this purpose is the Thyristor Controlled Series Capacitor (TCSC) . TCSC dynamically adjusts line impedance , allowing for enhanced power flow, transient stability improvement, and subsynchronous resonance (SSR) mitigation . Unlike conventional fixed series capacitors, TCSC uses thyristor-controlled switching to regulate the compensation level in real-time, ensuring grid reliability and efficiency . In this article, we will explore: ✅ The working principle and internal structure of TCSC ✅ Modes of operation and impedance control mechanisms ✅ How TCSC enhances power system efficiency and stability Understanding the Thyristor Controlled Series Capacitor (TCSC) What is a TCSC? A Thyristor Controlled Series Capacitor (TCSC) is a power electronic-based controller used in transmission systems to ...